Wednesday, 27 January 2010

Production log

27/01/10 Production stage-pre production
Today in our groups we came together to develop a logo for our production company and designed our institutional logo for our production company. We also had to do a little portfolio and research on our the type of audience we are planning to target and on the type genre we are doing.

29/01/10 Pre-production
Today we discuss the what makes a good treatment and the conventions of a treatment for a thriller movie. we also analyse a treatment to see whether it was a good or bad treatment. After this we started to produced ideas for our own treatment for our thriller.

02/02/10 Pre-production
Today we finished our treatments and did any further adjustments needed before we pitch our treatment to the class.

03/02/10 Pre-production
Today we pitch our treatments but there was complications which our classmates helped us to point out so we discuss what we had to do to solve these complications or change the treatment. We also listened to other students treatments to see if there ideas were up to standard and any feedback needed.

05/02/10 Planning
Today we came up with a ideas as our first one wasn't working for us. After this we started to discuss our new treatment and shot types we plan on using. We also assigned different tasks to each group members. After this was sorted we started story boarding.

08/02/10 Planning
Today another member of the group and I went find locations for our film.
09/02/10 Planning
Today I finished writing the opening sequence and uploaded our recce locations and say why we chose these locations. I also finished and uploaded our audience profile.
10/02/10 Planning
Today we finished off any unfinished work such as images for recci for both individual and group blog.
12/02/10 Planning
Finished unfinished work and I upload images of props we are thinking of using when filming which i research on the internet and copy the images.
24/02/10 Production
Today we started filming our project where I was the camera person for filming some high angles of the girl walking in the car park unfortunately a group member forgot the tape so we i had to improvise and use a camera.
1/03/10 Production
We return to our first location as the first footage wasnt good enough so I had to re shoot the high angles for our CCTV footage however for some of the shots I switched role as some of the shots weren't high enough where the other group member was taller than me to reach the height that we wanted so I was also director.
2/03/10 Production
Today another group member and I let down our group member because we were absent.
4/03/10 Production
Today I was both director and camera person as I couldnt do all the shots. We shot our actor in the tube station walking up the stairs from high angles and another group member shot the low angles of her feet. We also went on the train to shoot establishing shots, the actor getting on the train and off the train and so on.
8/03/10
Other group members uploaded the footages that we had while I was taught how to use live type for our credits which we then experimented on.
9/03/10
Today we went Canery Wharf,London bridge and Waterloo to shoot as many shots as we could where I was the camera person.
10/03/10
Our role got switched today as I was the actor for the stalker role in our last scene.
12/03/10
Today I filmed the assassin changing.
15/03/10
we uploaded footages.
16/03/10
Did some more shoots of the last scene where i was both camera and actor.
17/03/10
Redo the changing scene for the assasin as the first ones weren't good enough where I was the camera person.
19/03/10
Uploaded footages today and editing.
21/03/10
Filmed close ups of screens in the security box where I was the camera person.
22/03/10
Redo the close ups and did some shots of my hands opersting an technology and redo the killing scene where I was some times the actor and some time the camera person.
23/03/10
We started editing and making editing decision together.